ICN - Pitesti

1971 - Choosing the location for the institute

1973 - The first buildings and foundations
 

1974 - Heavy structures for the reactor

1974 - Tanks area for collecting liquid radioactive waste
 

1975 - The structures of the Nuclear Fuel Fabrication Department

1976 - Installing the 300 m3 pool
 

1976 - Installing the pool of the TRIGA reactor

1977 - Panoramic view of the institute

Last modified: 27-01-2014.


SCIENTIFIC MEETINGS

  • Optimized for Internet Explorer 7 or newer