// SCN/  English   Romana 
PERFORMCOR
Home Project presentation Objectives Project relevance Project stages Results Working team Access conditions

Project Stages

 

 

*    STAGE I. The evaluation of the corrosive processes that affect the metallic components from the primary circuit of one NPP (15.12.2007)

 

*      ACTIVITY I.1.  The evaluation of corrosion processes of Zy-4 alloy and several steels in specific operation conditions of primary circuit.

*      ACTIVITY I.2. Technical specifications for new equipments acquisition.

 

 

*    STAGE II. The evaluation of the corrosive processes that affect the nickel alloys and several steels types components from the secondary circuit (30.06.2008)

 

*      ACTIVITY II.1 Corrosion testing of the nickel alloys and several steels samples in establish conditions of the secondary circuit operation.

*      ACTIVITY II.2 Analysis and corrosion evaluation of materials tested function of experimental conditions; the introduction of results in data basis

 

 

*      STAGE III. The elaboration and verification of new corrosion analysis methods (15.12.2008)

 

*      ACTIVITY III.1 The acquisition, putting into service of the equipment

*      .ACTIVITY III.2 Description and the verification of corrosion analyses methods by testing of performances  and determined the parameters of equipments

 

 

*      STAGE IV. Implementation of X –rays diffraction new techniques in the study and evaluation of corrosion of materials used different equipments of industrial installations from important national sectors (14.09.2009)

 

*      ACTIVITY IV.1 The realization of X Rays analyzes using different X Rays diffraction techniques with the aim to demonstrate the utility of theses methods in investigation of corrosion effects activity; The elaboration or actualization of technical procedures by XRD used in study of corrosion of metallic components of nuclear installations 

*      ACTIVITY IV.2 The comparison of XRD results with the different results obtained by other methods. The preparation of certification documents.

Last update: 14.09.2009

Alice Dinu

E-mail: alice.dinu@nuclear.ro

 


Recomandari: Rezolutie video
minim 1024 x 768,
Internet Explorer 6

Webmaster: webmaster@nuclear.ro

Copyright © 2009 S.C.N. Pitesti
sus