// SCN/  English   Romana 

    Stage I – Dead-line: 15.12.2007
  • Determination of the technical level of performance of the equipments to ensure their compatibility with requirements for utilization.
  • Determination of the design requirements for adapting of the hot cells in order to install the equipments.
    Stage II – Dead-line: 10.12.2008
  • Purchasing of equipments: milling machine for preparation of radioactive samples for mechanical testing, optical microscope for radioactive materials.
  • Elaboration of the technical designs for adapting of the hot cells in order to install the purchased equipments.
    Stage III – Dead-line: 14.09.2009
  • Purchasing of the scanning electron microscope.
  • Adapting of the hot cells and installing of the purchased equipments.
  • Elaboration of the working procedures and implementation of the investment to evaluate the performance of the irradiated nuclear fuel and materials.
Last update: 14.09.2009

Marcel Parvan

E-mail: marcel.parvan@nuclear.ro

 


Recomandari: Rezolutie video
minim 1024 x 768,
Internet Explorer 6

Webmaster: webmaster@nuclear.ro

Copyright © 2009 S.C.N. Pitesti
sus