STAGES AND ACTIVITIES:
- Stage I – Development of the concept of “ Integrated technological Platform for Elactrochemical Surface Engineering of advanced materials”
Activities:
- Studies and Analysis concerning the expanding and the modernization of research potential in Surface Science
- Stage II – Developing of the Integrated Base of Research in Surface Science
Activities:
- The expanding and the modernization of research potential in Surface Science
- Development of the concept of the Processes and Structures Diagnosis Module
- Stage III – Development of the Integrated Technological Platform for Surface Electrochemical Engineering of advanced materials
Activities:
- Development of the Integrated Laboratory for Electrodeposition of Carbonic films – ILECA
- Development of the Control and Prediction System of Flowing Accelerated Corrosion Processes – CPS-FAC
- Stage IV – Development of the industrial application
Activities:
- Technological Development
- Nuclear materials application
- Aero-spatial applications
- Development of an Business Incubator in the Surface Nanoengineering range
- Establishment of a set of Proposals for FP7, PNCD and Structural Funds Projects
Scientific activities developed in the frame of the proposed project.
|